The Tracer can accept 12V, 24V nominal off-grid solar module arrays. Grid tie
solar module(s) may be used if the open circuit voltage does not exceed the maximum
solar input rating. The solar module(s) nominal voltage must be equal to or greater
than the nominal battery voltage.
Figure3-3 Solar Module wiring
Step 4: Accessories (option)
Install Remote Meter (purchased separately) if required. Refer to the instructions
provided for detailed installation procedures.
Step 5: Confirm Wiring
Double-check the wiring in step1 through 4. Confirm correct polarity at each
connection. Verify that all six power terminals are tightened.
Step 6: Confirm Power-up
When battery power is applied and the Tracer powers up, the battery led indicator
will be green.
If the Tracer does not power up or battery status LEDs error exists, refer to
Section 5 Troubleshooting